Picture a small design studio of five people that tracks its work in a shared spreadsheet and a long chat thread. Nobody is sure which client jobs are late. The owner decides to try a project management tool, picks the first one that looks good, and signs the whole team up on a Monday. Two weeks later three people have stopped logging in and the trial has lapsed. This is an illustration, not a real business, but it shows why a trial is better run as a pilot than as a try-out.
What went wrong in the illustration
The studio tested one tool, with no agreed task, no measure of success and no end date. People used it a little, for different things, and there was nothing to compare it with. A pilot fixes each of those gaps. It names a small group, a real project, two or three tools and a way to judge them.
What the trial market looks like
Our Project Management category holds 20 offers, and 19 give a length. As recorded at the time we checked (November 2026), 14 are 14 days, three are 15 days and two are 30 days. Eighteen are marked as needing no card and one, TeamGantt, as needing one. None is flagged as renewing. So for most tools you have two weeks, which is ten working days, and you can compare several without a billing commitment.

- 14 days, no card: monday.com Pro, Hive, GanttPRO, Celoxis, Active Collab, Scoro, Intervals
- 15 days, no card: Paymo, Zoho Sprints
- 30 days, no card: ProjectManager.com, Backlog
- Different cases: TeamGantt (14 days, card needed), Zoho Projects (10 to 15 days, pages conflict), Asana (no length recorded, no card)
Before the pilot starts
Decide four things in a 30-minute meeting.
- Who is in it. Two or three people, including one sceptic. Do not enrol the whole company.
- Which real project. One live job with a deadline inside the trial, not a made-up example.
- What success looks like. For example, “everyone can see who owns what without asking” and “we spend less time on status updates”.
- Which tools. Pick two with similar trial lengths, so they run side by side. Hive and GanttPRO are both 14 days with no card, for example.
The two weeks
Week one: build it
On Monday, set up the project, list the real tasks, assign owners and dates, and invite the pilot group. Spend Tuesday to Friday working from the tool and nowhere else. That last rule matters: a pilot that runs alongside the old spreadsheet proves nothing, because people drift back to what they know.

Week two: stress it
Add the awkward things. A client change, a task that moves between people, a deadline that slips. See how the tool handles each. Ask a person outside the pilot to find the status of one job using only the tool. If they cannot do it in a minute, note that.
How to score it
Use the same short scorecard for each tool. Rate each line from one to five.
- Time to set up a project from scratch.
- How easily a new person finds what they need.
- Whether the pilot group chose to use it without being reminded.
- Reporting: can you see what is late in two clicks?
- Cost of the plan you would really need, per person, for a year.
The last line is where trials mislead. The studio in our illustration tested a higher tier than the one it could afford. Always check which plan the trial unlocks, and what the plan for five people costs without it.
Close it out properly
On the last day, hold a 20-minute review. Compare scores, hear from the sceptic, and decide: adopt one, run a second round or stay as you are. Both outcomes are valid. Then export your project data from the tool you reject and cancel the account on the same day, so no data and no renewal are left behind. If a card was used, our guide to card-required and no-card trials explains what to watch for.
Mistakes a pilot should avoid
- Starting on a quiet week, when nothing real is at stake.
- Letting the most enthusiastic person configure everything, so the tool reflects one person’s habits.
- Importing years of old tasks, which turns a two-week test into a clean-up job.
- Judging a tool by its appearance in the first hour instead of its behaviour in the second week.
- Forgetting to ask what happens to your data when the trial ends.
Keep the pilot small and the rules simple, and the result will be something the whole team trusts when you roll it out.
Time tracking as an add-on
If your pilot also covers billable hours, note that time tracking tools appear in our Office and Documents category, 19 of them, mostly at 14 days and no card. Toggl Track and Harvest are 30 days, and Hubstaff is 14. Test them with the same group, in the same fortnight, so you can judge the whole workflow at once.
The bottom line
A team trial works when it is a pilot: a small group, a real project, two tools, a scorecard and a decision date. Most project management trials give you 14 days, which is ten working days, and 18 of the 20 on our site need no card. Check which plan you are really testing, and confirm all terms on the provider’s page.